
High-Performance PEB Factory Buildings — Engineered for Manufacturing
EOT crane-ready up to 100MT · Mezzanine-capable · Turnkey from design to handover · IS 800 / IS 875 / IS 1893 compliant

What is it?
Factory Buildings
A factory building is not a shed — it is a precision-engineered production environment. At Poojary Prefab, factory buildings are designed from the first line by our in-house structural engineering team to match your specific process layout, crane requirement, mezzanine configuration, and compliance obligations. Every beam, column, and purlin is fabricated at our Wagholi plant and traceable to a mill test certificate.
Unlike contractors who outsource fabrication to third parties, Poojary Prefab manufactures all structural components at our own facility in Wagholi, Pune — no middlemen, no coordination gaps. This gives you a single point of accountability, a faster build timeline, and direct quality control at every stage. The result is a factory building that performs exactly as specified from day one.
We have delivered factory buildings for automobile OEMs, heavy engineering firms, textile manufacturers, and food processing plants across Pune's MIDC zones — Chakan, Ranjangaon, Pirangut, and beyond. Every project leaves our plant engineered to IS 800:2007, IS 875, and IS 1893, with full structural documentation for MIDC, municipal, and insurance requirements.
Configurations
Which Type Do You Need?
Every site has different requirements. Here's how our range breaks down.
Crane-Bay Factory
Rigid frame structure with integrated EOT crane runways from 5MT to 100MT. Designed for heavy engineering, fabrication shops, press operations, and automotive component manufacturing requiring overhead lifting.
Multi-Level Factory
Ground floor production + mezzanine for offices, utilities, and quality labs — all within one integrated structural system. Maximises vertical space without additional footprint.
Multi-Bay Complex
Connected bays at different heights — production area, assembly block, finishing hall, canopy — designed as one unified structure with shared intermediate columns for cost efficiency.
Regulated Industry Factory
Fire-rated panels (60–120 min), chemical-resistant cladding, and cleanroom-compatible interiors for pharma, food, and defence manufacturing with strict compliance requirements.
Key Benefits
Stronger by Design. Smarter by Choice.
Integrated EOT Crane Systems
Built-in crane girders and runway beams for capacities up to 100MT. Engineered into the primary portal frame from day one — not added afterwards as an afterthought. We coordinate directly with your crane supplier.
High-Bay Clear-Span Design
Rigid frame construction delivers column-free workspace for any production layout — assembly lines, press shops, robotic welding, or large component manufacturing. No columns, no compromise.
Mezzanine Floor Integration
Multi-level operations — offices, storage, QC lab, utilities — built into the structural system from design. Not retrofitted. Load-bearing mezzanine capacity is engineered to your floor load specification.
Turnkey Single Contract
Structural design, in-house fabrication, civil works, and erection under one fixed-price contract from our Wagholi plant. No subcontracting the critical path. One point of contact, one timeline.
Applications
Built for Every Industry
Automobile & Auto-Ancillary
Spacious. Strong. Built for storage.
Heavy Engineering & Fabrication
Designed for productivity. Built to perform.
Textile & Apparel
Modern spaces. Engineered to inspire.
Chemicals & Petrochemicals
Wide clear spans for aviation excellence.
Defence & Aerospace
Attractive. Functional. Future-ready spaces.
Food & Beverage Processing
Reliable structures for rural progress.
Technical Specifications
Engineered to Excel

| Parameter | Specification |
|---|---|
| Clear Span Width | Up to 90m |
| Eave Height | Up to 25m |
| Bay Spacing | 6m to 12m |
| Primary Steel Grade | IS 2062 E350 / E450 |
| Crane Capacity | Up to 100MT EOT crane |
| Roofing | Insulated sandwich panels / PPGI |
| Wall Systems | PUF / EPS sandwich panels; fire-rated options |
| Design Standards | IS 800:2007, IS 875 Parts I–III, IS 1893 |
| Fire Rating | 60 min / 90 min / 120 min options |
| Optional Add-ons | Crane rail systems, mezzanine, skylights, pit provisions, epoxy flooring |
| Delivery Lead Time | 60–90 days from design sign-off |
| Structural Warranty | 10 years |
— The Process
From Enquiry
to Handover
A milestone-based process with no surprises. One point of contact from day one to handover.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Ready to start?
Free consultation. Quote within 24 hours. Project kickoff within a week.
What Our Clients Say
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Trusted by Industry Leaders


















Frequently Asked Questions
View All FAQsStart Your Project
Ready to Start Your Project?
Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.
Explore More
Related Products
Warehouses
High-clearance PEB warehouses for logistics, storage and distribution. Clear spans up to 90m.
Industrial Sheds
Wide-span sheds for manufacturing, assembly and processing. Delivered ready to operate.
Cold Storages
Insulated PEB cold storage structures for food, pharma and agri applications.
