
Pre-Engineered Industrial Sheds in Pune — Strong, Fast, Affordable
Serving MIDC areas across Pune — Chakan, Ranjangaon, Pirangut, Bhosari · Ready in 6–8 weeks · EOT crane provision · IS 800 compliant

What is it?
Industrial Sheds
Pre-engineered industrial sheds are the default choice for MSMEs, manufacturers, and engineering units setting up in Pune's MIDC industrial zones — and for good reason. A PEB shed from Poojary Prefab is fabricated at our Wagholi plant and erected on your site in 6–8 weeks, at a cost 20–30% lower than an equivalent RCC structure. There are no contractor delays, no site-cast guesswork, and no surprises on your final bill.
Unlike conventional sheds that impose fixed column grids, our PEB industrial sheds deliver full clear-span floors — no internal columns disrupting your production layout, CNC bed positions, or assembly lines. Spans from 9m to 60m are available. EOT crane provisions are engineered into the primary frame from day one, not added as an afterthought.
Every shed we fabricate complies with IS 800:2007 structural steel standards and IS 875 Part 3 wind load design for Maharashtra. We have delivered industrial sheds across Chakan, Ranjangaon, Pirangut, Bhosari, Pimpri, and Talegaon MIDC — and we understand the documentation and approval process for each area.
Configurations
Which Type Do You Need?
Every site has different requirements. Here's how our range breaks down.
Light Manufacturing Shed
9–30m spans for light-to-medium manufacturing, assembly, and packaging units. Cost-effective single-skin structure with natural ventilation — the most common MSME shed in Pune MIDC.
Heavy Industry Shed
30–60m spans with EOT crane provisions for heavy CNC machining, fabrication beds, press shops, and heat treatment lines requiring high eave clearance.
Multi-Bay Industrial Complex
Multiple connected bays of varying heights — production area, utility room, office block, and canopy — designed as one integrated structural system with shared intermediate columns.
Food Processing Shed
Hygienic PUF-insulated wall panels, smooth internal surfaces, and pest-resistant construction. FSSAI-compatible design for food and agri-processing units in Maharashtra.
Key Benefits
Stronger by Design. Smarter by Choice.
Lowest Cost Per Sqft
Factory-direct fabrication at our Wagholi plant — no distributor margins. Starting from ₹800/sqft. You pay manufacturing cost, not retail markup. PEB is 20–30% cheaper than RCC for the same span.
Ready in 6–8 Weeks
From design sign-off to handover — faster than any RCC construction timeline. Get your production line running months sooner. Time saved is working capital freed.
No Column Obstructions
Full clear-span floor — position machinery, assembly lines, or racks anywhere. No columns breaking up your production layout or restricting forklift movement.
MIDC-Ready Documentation
IS 800:2007 structural drawings with MIDC-compliant design parameters. Our documentation package is accepted across Chakan, Ranjangaon, Bhosari, and all major Pune MIDC zones.
Applications
Built for Every Industry
Manufacturing & Assembly
Designed for productivity. Built to perform.
Auto Component Workshops
Designed for productivity. Built to perform.
Engineering & Fabrication
Modern spaces. Engineered to inspire.
Food Processing Units
Wide clear spans for aviation excellence.
Chemical & Pharma Facilities
Hygienic. Compliant. Engineered for health.
General MSME Units
Reliable structures for rural progress.
Technical Specifications
Engineered to Excel

| Parameter | Specification |
|---|---|
| Clear Span Width | 9m to 60m |
| Eave Height | 4.5m to 15m |
| Bay Spacing | 5m to 8m |
| Primary Steel Grade | IS 2062 E250 / E350 |
| Roofing | PPGI / Colour-coated GI / Insulated panels |
| Wall Cladding | PPGI / EPS sandwich panels (50mm) |
| Design Standards | IS 800:2007, IS 875 Part 3 |
| EOT Crane Provision | Up to 50MT crane runway (on request) |
| Optional Add-ons | Mezzanine, translucent sheets, ridge ventilators |
| Delivery Lead Time | 6–8 weeks from design sign-off |
| Structural Warranty | 10 years |
— The Process
From Enquiry
to Handover
A milestone-based process with no surprises. One point of contact from day one to handover.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Ready to start?
Free consultation. Quote within 24 hours. Project kickoff within a week.
What Our Clients Say
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Trusted by Industry Leaders


















Frequently Asked Questions
View All FAQsStart Your Project
Ready to Start Your Project?
Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.
Explore More
Related Products
Warehouses
High-clearance PEB warehouses for logistics, storage and distribution. Clear spans up to 90m.
Factory Buildings
Custom-engineered factory structures with crane provisions, mezzanine floors and flexible bay layouts.
Cold Storages
Insulated PEB cold storage structures for food, pharma and agri applications.
