Poojary Prefab Pvt Ltd
Poojary Prefab structure
Industrial Sheds

Pre-Engineered Industrial Sheds in Pune — Strong, Fast, Affordable

Serving MIDC areas across Pune — Chakan, Ranjangaon, Pirangut, Bhosari · Ready in 6–8 weeks · EOT crane provision · IS 800 compliant

Industrial Sheds structure

What is it?

Industrial Sheds

Pre-engineered industrial sheds are the default choice for MSMEs, manufacturers, and engineering units setting up in Pune's MIDC industrial zones — and for good reason. A PEB shed from Poojary Prefab is fabricated at our Wagholi plant and erected on your site in 6–8 weeks, at a cost 20–30% lower than an equivalent RCC structure. There are no contractor delays, no site-cast guesswork, and no surprises on your final bill.

Unlike conventional sheds that impose fixed column grids, our PEB industrial sheds deliver full clear-span floors — no internal columns disrupting your production layout, CNC bed positions, or assembly lines. Spans from 9m to 60m are available. EOT crane provisions are engineered into the primary frame from day one, not added as an afterthought.

Every shed we fabricate complies with IS 800:2007 structural steel standards and IS 875 Part 3 wind load design for Maharashtra. We have delivered industrial sheds across Chakan, Ranjangaon, Pirangut, Bhosari, Pimpri, and Talegaon MIDC — and we understand the documentation and approval process for each area.

Configurations

Which Type Do You Need?

Every site has different requirements. Here's how our range breaks down.

Light Manufacturing Shed

9–30m spans for light-to-medium manufacturing, assembly, and packaging units. Cost-effective single-skin structure with natural ventilation — the most common MSME shed in Pune MIDC.

Heavy Industry Shed

30–60m spans with EOT crane provisions for heavy CNC machining, fabrication beds, press shops, and heat treatment lines requiring high eave clearance.

Multi-Bay Industrial Complex

Multiple connected bays of varying heights — production area, utility room, office block, and canopy — designed as one integrated structural system with shared intermediate columns.

Food Processing Shed

Hygienic PUF-insulated wall panels, smooth internal surfaces, and pest-resistant construction. FSSAI-compatible design for food and agri-processing units in Maharashtra.

Key Benefits

Stronger by Design. Smarter by Choice.

Lowest Cost Per Sqft

Factory-direct fabrication at our Wagholi plant — no distributor margins. Starting from ₹800/sqft. You pay manufacturing cost, not retail markup. PEB is 20–30% cheaper than RCC for the same span.

Ready in 6–8 Weeks

From design sign-off to handover — faster than any RCC construction timeline. Get your production line running months sooner. Time saved is working capital freed.

No Column Obstructions

Full clear-span floor — position machinery, assembly lines, or racks anywhere. No columns breaking up your production layout or restricting forklift movement.

MIDC-Ready Documentation

IS 800:2007 structural drawings with MIDC-compliant design parameters. Our documentation package is accepted across Chakan, Ranjangaon, Bhosari, and all major Pune MIDC zones.

Applications

Built for Every Industry

Manufacturing & Assembly application

Manufacturing & Assembly

Designed for productivity. Built to perform.

Auto Component Workshops application

Auto Component Workshops

Designed for productivity. Built to perform.

Engineering & Fabrication application

Engineering & Fabrication

Modern spaces. Engineered to inspire.

Food Processing Units application

Food Processing Units

Wide clear spans for aviation excellence.

Chemical & Pharma Facilities application

Chemical & Pharma Facilities

Hygienic. Compliant. Engineered for health.

General MSME Units application

General MSME Units

Reliable structures for rural progress.

Technical Specifications

Engineered to Excel

ParameterSpecification
Clear Span Width9m to 60m
Eave Height4.5m to 15m
Bay Spacing5m to 8m
Primary Steel GradeIS 2062 E250 / E350
RoofingPPGI / Colour-coated GI / Insulated panels
Wall CladdingPPGI / EPS sandwich panels (50mm)
Design StandardsIS 800:2007, IS 875 Part 3
EOT Crane ProvisionUp to 50MT crane runway (on request)
Optional Add-onsMezzanine, translucent sheets, ridge ventilators
Delivery Lead Time6–8 weeks from design sign-off
Structural Warranty10 years

— The Process

From Enquiry
to Handover

A milestone-based process with no surprises. One point of contact from day one to handover.

01
Stage 1

Enquiry & Brief

Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.

02
Stage 2

Design & Quotation

Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.

03
Stage 3

Contract & Approvals

We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.

04
Stage 4

Factory Fabrication

Steel sections are cut, drilled, and assembled in our ISO-certified facility.

05
Stage 5

Site Erection

Our own erection crew arrives on site. No subcontracting the critical path.

06
Stage 6

Handover & Support

Structural warranty documentation, post-handover support reachable by phone and WhatsApp.

Ready to start?

Free consultation. Quote within 24 hours. Project kickoff within a week.

Start Your Project Today
Client Feedback

What Our Clients Say

Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.

R
Rajesh Shetty
Plant Head — AutoParts Manufacturing

We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.

S
Sunil Nair
Project Manager — Infrastructure Developers

The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.

P
Priya Menon
MD — FreshChain Logistics

Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.

R
Rajesh Shetty
Plant Head — AutoParts Manufacturing

We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.

S
Sunil Nair
Project Manager — Infrastructure Developers

The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.

P
Priya Menon
MD — FreshChain Logistics

Trusted by Industry Leaders

Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India
Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India

Frequently Asked Questions

View All FAQs

Start Your Project

Ready to Start Your Project?

Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.

Chat on WhatsApp