
School InfrastructureDelivered in 45–90 Days.
Modular LGSF school buildings — classrooms, science labs, libraries, admin blocks, and staff rooms — CPWD/NBC compliant, fire-safe, and fully accessible. Ready for occupancy in 45–90 days.

What is it?
Prefab Schools
India's demand for school infrastructure vastly outpaces the capacity of conventional construction to deliver it. A traditionally built school block takes 18–36 months from sanction to occupancy, during which thousands of children sit in temporary arrangements, open spaces, or dangerously dilapidated structures. Modular prefab school buildings using Light Gauge Steel Framing collapse that timeline to 45–90 days — from factory fabrication to a fully fitted, occupied school block.
Poojary Prefab designs and builds prefab school buildings for state governments under schemes like PM SHRI and Samagra Shiksha, for private school chains expanding to new campuses, and for NGOs establishing education infrastructure in underserved communities. Our school buildings meet CPWD specifications, National Building Code requirements, the Right to Education Act's infrastructure norms, and GRIHA / green building provisions where mandated. Every building includes fire safety provisions, disability access (ramped entry, accessible toilets), adequate natural lighting, and cross-ventilation consistent with health and hygiene guidelines.
Our modular approach means that school buildings can be expanded incrementally as enrolment grows. New classroom blocks, a new science lab wing, or an additional storey can be added to an existing LGSF campus without disrupting school operations. The dry construction process also makes installation possible during the school calendar year with minimal site disruption, unlike RCC construction which requires sustained access and generates significant dust and noise over many months.
Configurations
Which Type Do You Need?
Every site has different requirements. Here's how our range breaks down.
Classroom Blocks
Single or multi-storey classroom blocks with 2 to 16 classrooms per block. Standard RTE class area of 400–500 sq ft per classroom with acoustic separation, natural lighting, and ventilation.
Science & Computer Labs
Laboratory blocks with utility infrastructure: laboratory benching, electrical outlets, fume provision, computer network conduit, and appropriate flooring for chemical resistance or static dissipation.
Library & Resource Blocks
Quiet-zone library and resource room blocks with controlled natural lighting, high wall shelving provision, and reading area layouts. May include a multipurpose room or language lab.
Admin & Staff Blocks
Principal's office, staff rooms, reception, records room, and administrative work areas. Designed separately from classroom blocks for noise separation and security control.
Key Benefits
Stronger by Design. Smarter by Choice.
45–90 Day Completion
School blocks are fabricated in our factory while site preparation proceeds simultaneously. By the time foundation work is complete, sections are ready for installation. A 10-classroom block is ready for occupancy within 60–75 days — before the next academic term.
Government Specification Compliant
Our school buildings are designed to CPWD specifications and can be supplied with full drawing packages, structural engineer certificates, and compliance documentation required for government procurement and approval processes.
Healthy Learning Environment
Adequate natural lighting (BIS norms), cross-ventilation, acoustic separation between classrooms, and hygienic finishes create a learning environment that measurably improves attendance, concentration, and learning outcomes.
Expandable as You Grow
Unlike RCC construction, an LGSF campus can add a new wing or an additional storey without structural disruption to existing buildings. Schools can start with what they need today and expand as enrolment grows — without rebuilding.
Applications
Built for Every Industry
Government Schools
State & central government schemes
Private School Chains
Fast campus expansion projects
NGO Projects
Community education infrastructure
Tribal & Rural Areas
Remote & underserved locations
Disaster Relief
School replacement post-disaster
Temporary Schools
While permanent buildings are built
Technical Specifications
Engineered to Excel

| Parameter | Specification |
|---|---|
| Frame System | LGSF cold-formed steel, G550/G500 grade |
| Structural Code | IS 801, NBC 2016, CPWD Specifications |
| Standard Classroom | Min. 400 sq ft (RTE norm); custom sizes available |
| Floor Height | 3.0 m minimum (NBC educational buildings) |
| Building Height | G+0 to G+3 standard; G+5 with engineered design |
| Wall Construction | LGSF studs with cement board / gypsum board sheathing |
| Roofing | Metal deck or insulated sandwich panel roof system |
| Flooring | Vitrified tile or vinyl sheet over LGSF floor deck |
| Fire Rating | 1–2 hours (walls and floor/ceiling assemblies) |
| Accessibility | Ramped access, accessible toilets, IS 3146 compliant |
| Acoustic Performance | STC 40–45 dB between classrooms |
| Deployment Time | 45–90 days from order confirmation |
— The Process
From Enquiry
to Handover
A milestone-based process with no surprises. One point of contact from day one to handover.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Ready to start?
Free consultation. Quote within 24 hours. Project kickoff within a week.
What Our Clients Say
Honestly didn't expect this level of finish on a PEB structure. The fabrication was clean, the erection crew knew what they were doing, and we were operational two weeks before our target date. Will definitely be coming back for our next shed.
We've used three different prefab vendors over the years. Poojary Prefab Pvt Ltd is the only one that gave us a fixed price and actually stuck to it. No surprises on the final invoice. That alone is worth everything.
The cold storage has been running at -22°C continuously for 18 months. Not a single structural complaint. Our FSSAI inspection went through without a hitch. Genuinely impressed.
Honestly didn't expect this level of finish on a PEB structure. The fabrication was clean, the erection crew knew what they were doing, and we were operational two weeks before our target date. Will definitely be coming back for our next shed.
We've used three different prefab vendors over the years. Poojary Prefab Pvt Ltd is the only one that gave us a fixed price and actually stuck to it. No surprises on the final invoice. That alone is worth everything.
The cold storage has been running at -22°C continuously for 18 months. Not a single structural complaint. Our FSSAI inspection went through without a hitch. Genuinely impressed.
We needed a 400-person labour camp set up before monsoon hit. Poojary Prefab Pvt Ltd's team worked through weekends to make it happen. The workers themselves said it was better than camps they'd seen on other sites.
I was sceptical about PEB for a pharma facility — clean room requirements are strict. Poojary Prefab Pvt Ltd walked us through every spec, made the necessary design changes without fuss, and delivered a building that cleared validation on the first pass.
What I appreciate most is that there's one number to call. No chasing multiple contractors. When a purlins alignment issue came up during erection, the site supervisor sorted it the same afternoon without escalating it into a big deal.
We needed a 400-person labour camp set up before monsoon hit. Poojary Prefab Pvt Ltd's team worked through weekends to make it happen. The workers themselves said it was better than camps they'd seen on other sites.
I was sceptical about PEB for a pharma facility — clean room requirements are strict. Poojary Prefab Pvt Ltd walked us through every spec, made the necessary design changes without fuss, and delivered a building that cleared validation on the first pass.
What I appreciate most is that there's one number to call. No chasing multiple contractors. When a purlins alignment issue came up during erection, the site supervisor sorted it the same afternoon without escalating it into a big deal.
We've done three warehouses with Poojary Prefab Pvt Ltd across Maharashtra. Each one handed over on time, each one at the quoted price. That kind of consistency is rare in this industry.
The site office cabin they set up for us was ready in five days — AC, electrics, partitions, the works. We've had it for two years now and it still looks good. Build quality is solid.
I compared four vendors before going with Poojary Prefab Pvt Ltd. Their quote wasn't the cheapest but they were the only ones who could show me a completed project of similar scale nearby. That visit sold me.
We've done three warehouses with Poojary Prefab Pvt Ltd across Maharashtra. Each one handed over on time, each one at the quoted price. That kind of consistency is rare in this industry.
The site office cabin they set up for us was ready in five days — AC, electrics, partitions, the works. We've had it for two years now and it still looks good. Build quality is solid.
I compared four vendors before going with Poojary Prefab Pvt Ltd. Their quote wasn't the cheapest but they were the only ones who could show me a completed project of similar scale nearby. That visit sold me.
Trusted by Industry Leaders


















Frequently Asked Questions
View All FAQsStart Your Project
Ready to Start Your Project?
Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.
Explore More
Related Products
Multi Storey Buildings
LGSF multi-storey structures for residential, commercial and institutional projects.
Prefab Hospitals
Healthcare-grade prefab hospital buildings with full MEP integration and clean-room capability.
Prefab Dormitories & Labour Quarters
Multi-level dormitory blocks with washrooms, kitchens and common areas. IS compliant.