
Dormitories & Labour Quarters.Multi-Level. Code Compliant.
LGSF-framed multi-level dormitory blocks for industrial labour camps, student hostels, armed forces barracks, and construction worker accommodation — IS compliant, fire-rated, and ready in 45–90 days.

What is it?
Prefab Dormitories & Labour Quarters
Providing safe, clean, and dignified accommodation for workers, students, and service personnel is not just a welfare obligation — it is a legal requirement under the Building and Other Construction Workers (BOCW) Act, the Factories Act, and various state labour welfare regulations. Yet conventional construction of dormitory blocks takes 12–24 months, making it impractical for project-based industries, rapidly expanding campuses, and organisations that need accommodation at a new location quickly.
Poojary Prefab's prefab dormitory buildings use Light Gauge Steel Framing to deliver multi-level accommodation blocks in 45–90 days. We build dormitory facilities for industrial labour camps adjacent to factories, refineries, power plants, and infrastructure projects; student hostels for engineering colleges, nursing institutes, and polytechnics; armed forces and paramilitary barracks in remote and border locations; and construction worker accommodation for large EPC contractors. Every building meets IS structural codes, BOCW welfare norms, and NBC fire safety provisions.
Beyond basic accommodation, our dormitory buildings are designed as functional living spaces: adequate bedroom area per person as per BOCW norms, shared washroom blocks with hot-water provision, common areas and mess/kitchen facilities, outdoor drying courts, and energy-efficient insulation that keeps accommodation comfortable in all Indian climate zones. Optional features include individual lockers, CCTV provisions, staff supervisor rooms, and laundry facilities. The modular construction means that accommodation capacity can be scaled up rapidly as workforce or student intake grows.
Configurations
Which Type Do You Need?
Every site has different requirements. Here's how our range breaks down.
Industrial Labour Camps
Accommodation for factory workers, refinery and power plant operators, or large infrastructure project workforces. Designed for high occupancy with robust, easy-to-clean surfaces and BOCW Act-compliant welfare provisions.
Student Hostels
Residential hostel blocks for engineering colleges, medical colleges, nursing institutes, and polytechnics. Individual room or shared room configurations, common room, study room, and warden's quarters included.
Armed Forces & Paramilitary Barracks
Barrack blocks for defence, police, CRPF, CISF, and border security deployments in remote and challenging terrain. Structural design accounts for high wind and seismic zones typical of border locations.
Construction Site Camps
Labour camp and site staff accommodation for EPC contractors and infrastructure developers. Scalable from 50-person to 2,000-person camps with modular add-ons as workforce mobilises.
Key Benefits
Stronger by Design. Smarter by Choice.
Rapid Mobilisation
A 100-person labour camp dormitory that takes 8–12 months in RCC can be fabricated and installed in 45–60 days. For project-based industries where workforce mobilises on a specific date, the ability to have compliant accommodation ready at mobilisation is a significant operational advantage.
Welfare Regulation Compliant
Our dormitory designs are developed against BOCW Act welfare provisions, Factories Act Schedule requirements, and NBC dormitory/hostel occupancy standards — ensuring that audits by factory inspectors, labour department officials, and health and safety officers are passed without remediation notices.
Energy Efficient & Comfortable
Properly insulated LGSF dormitories with low-U-value roofs and walls maintain comfortable internal temperatures without continuous air conditioning — significantly reducing operating costs for camps in hot or cold climates and improving sleeping quality for residents.
Scalable Capacity
Labour force size fluctuates over a project's life. LGSF dormitory blocks can be added as the workforce ramps up and removed or repurposed when the project demobilises — a scalability that RCC construction cannot offer.
Applications
Built for Every Industry
Industrial Labour
Factory & refinery workforce housing
Student Hostels
College & institute residential blocks
Armed Forces
Barracks & remote deployment
EPC Contractors
Project site labour camps
Mining & Power
Remote site worker accommodation
Disaster Relief
Emergency shelter post-disaster
Technical Specifications
Engineered to Excel

| Parameter | Specification |
|---|---|
| Frame System | LGSF cold-formed steel, G550/G500 grade |
| Structural Code | IS 801, NBC 2016, BOCW Act norms |
| Building Height | G+1 to G+4 (engineered design up to G+5) |
| Room Size | 9–12 sqm per room (BOCW norm: 3.3 sqm/person minimum) |
| Wall Insulation | Mineral wool or EPS within LGSF stud cavity |
| Roof System | Insulated sandwich panel or metal deck with insulation |
| Flooring | Vitrified tile or vinyl sheet over LGSF floor deck |
| Washroom Provision | IS 1172 ratio: min. 1 WC + 1 urinal per 20 persons |
| Hot Water | Solar or electric geyser provision in washroom blocks |
| Fire Safety | 1–2 hour fire-rated walls; sprinkler provision available |
| Acoustic Performance | STC 40–45 dB between sleeping rooms |
| Deployment Time | 45–90 days from confirmed order |
— The Process
From Enquiry
to Handover
A milestone-based process with no surprises. One point of contact from day one to handover.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Ready to start?
Free consultation. Quote within 24 hours. Project kickoff within a week.
What Our Clients Say
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Trusted by Industry Leaders


















Frequently Asked Questions
View All FAQsStart Your Project
Ready to Start Your Project?
Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.
Explore More
Related Products
Multi Storey Buildings
LGSF multi-storey structures for residential, commercial and institutional projects.
Prefab Schools
Modular school buildings deployed quickly — classrooms, labs and admin blocks.
Porta Cabins
Versatile porta cabins for offices, storage, accommodation and welfare on any site.
