Poojary Prefab Pvt Ltd
Prefab hospital building by Poojary Prefab
Light Gauge Steel Framing

Healthcare-Grade Hospitals.Commissioned in 60–90 Days.

Permanent prefab hospital buildings engineered for Indian healthcare norms — wards, OPD blocks, ICUs, operation theatres, and diagnostic centres with full MEP integration, infection control provisions, and NABH-compatible design.

Modular hospital ward block by Poojary Prefab

What is it?

Prefab Hospitals

India needs tens of thousands of new hospital beds. The conventional approach — designing, tendering, and constructing RCC hospital buildings — takes 3–5 years and costs significantly more than the actual healthcare infrastructure inside. Prefab hospital buildings using Light Gauge Steel Framing cut that timeline to 60–90 days for a fully commissioned hospital block, without compromising the structural integrity, clinical functionality, or regulatory compliance that healthcare facilities demand.

Poojary Prefab designs and builds healthcare facilities to Indian Public Health Standards (IPHS), NBC healthcare occupancy provisions, NABH accreditation infrastructure guidelines, and WHO-recommended infection control standards. Our hospital buildings are not repurposed modular offices — they are specifically engineered for healthcare: smooth, seamless wall surfaces for infection control, clean-room-capable ceiling and floor systems for OTs and ICUs, full integration of medical gas, electrical, HVAC, and data systems within wall cavities and ceiling voids, and floor loadings designed for heavy diagnostic equipment.

We have delivered prefab healthcare facilities for permanent district hospitals, sub-district health centres under PMSBY and Ayushman Bharat infrastructure programmes, emergency hospital deployments for disaster response, dialysis centres, blood banks, and private hospital expansion projects. Our end-to-end service covers structural engineering, MEP co-ordination, infection control provisions, and commissioning support — so that the healthcare operator receives a building that is ready to fit out and equip, not one that requires extensive additional works before equipment can go in.

Configurations

Which Type Do You Need?

Every site has different requirements. Here's how our range breaks down.

IPD Ward Blocks

In-patient department ward blocks — general wards, semi-private, and private room configurations. Designed with nurse station lines of sight, infection control zoning, and appropriate servicing.

OPD & Diagnostic Blocks

Out-patient department and diagnostic imaging blocks — consultation rooms, waiting areas, pharmacy counters, radiology rooms, and pathology laboratory spaces with appropriate radiation shielding provisions.

Operation Theatres & ICU

Positive-pressure clean rooms for OTs, negative-pressure isolation ICU rooms, and sterile service corridors. HEPA filtration HVAC, seamless flooring, and service void access panels.

Emergency & Casualty

Emergency department and casualty reception units — ambulance bay access, triage bays, trauma rooms, resuscitation areas, and crash-cart alcoves. Compliant with IPHS emergency department norms.

Key Benefits

Stronger by Design. Smarter by Choice.

60–90 Day Deployment

While a conventional hospital building takes 3–5 years, a complete prefab hospital block is fabricated, installed, and handed over in 60–90 days. For government health missions and private operators with expansion commitments, this timeline is transformative.

Clinical-Grade Specifications

These are not adapted office buildings. Our hospital structures are engineered from the floor up for healthcare: clean-room OTs, infection-control wall finishes, medical gas pipelines within wall cavities, and floor loadings for heavy diagnostic equipment.

NABH-Compatible Infrastructure

Our design process references NABH accreditation standards for fire safety, structural safety, engineering services, electrical safety, and infection control — so the building infrastructure supports accreditation from day one, rather than requiring remediation after construction.

Modular Expansion Ready

As patient volumes grow, new ward blocks, diagnostic wings, or speciality centres can be added to an existing LGSF hospital campus without structural disruption to operational areas. Healthcare operators can phase capital investment alongside revenue growth.

Applications

Built for Every Industry

Government Hospitals application

Government Hospitals

District, taluka & PHC expansion

Private Hospitals application

Private Hospitals

New blocks & capacity expansion

Emergency Response application

Emergency Response

Disaster relief medical units

Dialysis & Clinics application

Dialysis & Clinics

Specialised day-care facilities

Military & Paramilitary application

Military & Paramilitary

Field hospitals & remote medical posts

NGO Healthcare application

NGO Healthcare

Community health centres

Technical Specifications

Engineered to Excel

ParameterSpecification
Frame SystemLGSF cold-formed steel, G550/G500 grade
Structural CodeIS 801, NBC 2016, IPHS structural guidelines
Wall SurfaceSeamless gypsum or calcium silicate board, epoxy-painted
OT FloorConductive vinyl sheet over insulated substrate
OT CeilingModular lay-in with HEPA inlet and service access
Floor Load CapacityUp to 750 kg/sqm (radiology); 1,000 kg/sqm on request
Medical GasOxygen, N₂O, vacuum, compressed air pipeline provisions
HVACPositive pressure (OT/ICU) & negative pressure (isolation) zoning
Infection ControlCoved junctions, no horizontal ledges, seamless finishes
Fire Rating2-hour rated walls and ceiling assemblies
ElectricalDual-power UPS provision, clean earth, isolated power panels
Deployment Time60–90 days, scope and site dependent

— The Process

From Enquiry
to Handover

A milestone-based process with no surprises. One point of contact from day one to handover.

01
Stage 1

Enquiry & Brief

Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.

02
Stage 2

Design & Quotation

Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.

03
Stage 3

Contract & Approvals

We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.

04
Stage 4

Factory Fabrication

Steel sections are cut, drilled, and assembled in our ISO-certified facility.

05
Stage 5

Site Erection

Our own erection crew arrives on site. No subcontracting the critical path.

06
Stage 6

Handover & Support

Structural warranty documentation, post-handover support reachable by phone and WhatsApp.

Ready to start?

Free consultation. Quote within 24 hours. Project kickoff within a week.

Start Your Project Today
Client Feedback

What Our Clients Say

Honestly didn't expect this level of finish on a PEB structure. The fabrication was clean, the erection crew knew what they were doing, and we were operational two weeks before our target date. Will definitely be coming back for our next shed.

H
Harshvardhan Kulkarni
General Manager, Operations

We've used three different prefab vendors over the years. Poojary Prefab Pvt Ltd is the only one that gave us a fixed price and actually stuck to it. No surprises on the final invoice. That alone is worth everything.

S
Santosh Bhosale
Procurement Head

The cold storage has been running at -22°C continuously for 18 months. Not a single structural complaint. Our FSSAI inspection went through without a hitch. Genuinely impressed.

N
Nandita Iyer
Director, Supply Chain

Honestly didn't expect this level of finish on a PEB structure. The fabrication was clean, the erection crew knew what they were doing, and we were operational two weeks before our target date. Will definitely be coming back for our next shed.

H
Harshvardhan Kulkarni
General Manager, Operations

We've used three different prefab vendors over the years. Poojary Prefab Pvt Ltd is the only one that gave us a fixed price and actually stuck to it. No surprises on the final invoice. That alone is worth everything.

S
Santosh Bhosale
Procurement Head

The cold storage has been running at -22°C continuously for 18 months. Not a single structural complaint. Our FSSAI inspection went through without a hitch. Genuinely impressed.

N
Nandita Iyer
Director, Supply Chain

Trusted by Industry Leaders

Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India
Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India

Frequently Asked Questions

View All FAQs

Start Your Project

Ready to Start Your Project?

Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.