
Secure Prefab Control Rooms for Critical InfrastructureClimate-Controlled, Blast-Resistant, IEC-Compliant
Blast-resistant design options · HVAC integrated · Cable entry management · Raised flooring provisions · IS 50244 / IEC compliant

What is it?
Control Rooms
Control rooms are the nerve centres of critical industrial infrastructure — a failure of the control room environment means a failure of the process it monitors. Temperatures that exceed equipment operating limits, vibration from adjacent machinery, electromagnetic interference from HV switchgear, or a blast event from adjacent process plant can all compromise control room integrity. Poojary Prefab's prefab control rooms are engineered specifically to prevent these failure modes — each designed around the equipment it houses, the process environment it faces, and the regulatory standard it must meet.
Our control rooms are factory-built, precision-engineered structures that arrive on site as complete, tested units. Structural steel framing, insulated sandwich panel cladding, internal partition systems, raised access flooring, precision HVAC, cable entry management systems, and anti-static finishes are all factory-installed and commissioned before dispatch. This factory-assembly approach eliminates the quality variability that plagues field-built control rooms and guarantees environmental performance from day one of operation.
We serve the full spectrum of critical infrastructure operators: power generation plants (thermal, hydro, solar, nuclear-adjacent), high voltage substations, oil and gas upstream and downstream facilities, LNG terminals, refinery process units, petrochemical plants, and water treatment facilities. Our control rooms are designed in compliance with IS 50244, IEC 61340 (electrostatic discharge), IEC 60529 (IP rating), and blast loading standards where specified. Documentation is provided for CEIG, PESO, OISD, and international regulatory submissions.
Configurations
Which Type Do You Need?
Every site has different requirements. Here's how our range breaks down.
Substation Control Room
Insulated, climate-controlled buildings for HV/EHV substation SCADA and relay rooms. CEIG-compliant construction, anti-static flooring, segregated cable entry, and EMC shielding. Designed for IS 50244 and IEC 61439 compliance.
DCS / SCADA Operations Room
Positive-pressure climate-controlled rooms for DCS consoles, SCADA workstations, and operator interfaces. Precision air conditioning, raised access flooring, uninterrupted power provisions, and ergonomic operator console layout provisions.
Blast-Resistant Control Room
Structural panels designed to specified blast overpressure — typically 0.5–3.0 psi for process plant applications. Mass-plate clad construction, blast-rated door and window assemblies, and full compliance with ASCE 7 blast design provisions. For refineries, LNG terminals, and explosive risk zones.
Remote / Unmanned Substation Building
Compact, secure buildings for unmanned remote substations and telecom facilities — vandal-resistant cladding, access control provisions, environmental monitoring, and communication infrastructure mounting provisions. Designed for minimal maintenance in remote locations.
Key Benefits
Stronger by Design. Smarter by Choice.
Blast-Resistant to International Standards
Our blast-resistant control rooms are designed to ASCE 7 blast loading provisions and ISO 17776 (offshore risk) guidelines. Mass-plate construction, blast-rated door and window assemblies, and pressure-venting provisions ensure personnel safety and equipment continuity in the event of an adjacent process blast event.
Precision HVAC for Equipment Reliability
DCS and SCADA equipment operates reliably only within defined temperature and humidity bands — typically 20–25°C, 40–60% RH. Our N+1 precision HVAC maintains these conditions under all external conditions, with positive pressure preventing dust ingress and HEPA filtration options for chemically corrosive atmospheres.
Factory-Tested Before Dispatch
Every control room undergoes factory acceptance testing before dispatch — HVAC performance, cable entry integrity, raised floor load tests, and electrical continuity. On-site commissioning is reduced to service connections and final instrument hook-up. No remediation of site-built quality failures.
Full Regulatory Documentation Package
IS 50244, IEC 61340, IEC 60529 compliance certificates, blast calculation reports, structural design certificates, and HVAC performance documentation. Ready for CEIG, PESO, OISD, and international regulatory authority submissions.
Applications
Built for Every Industry
Power Plants
Thermal, hydro, solar and nuclear-adjacent generation
HV Substations
33kV to 765kV switchyard control buildings
Oil & Gas Plants
Refinery and upstream SCADA operations centres
LNG / Petrochemical
Blast-resistant rooms in explosive process zones
Water Treatment
SCADA control for municipal and industrial water plants
Defence & Security
Command and communications facilities
Technical Specifications
Engineered to Excel

| Parameter | Specification |
|---|---|
| Unit Size Range | Custom — 10 sqm to 500 sqm single or multi-room |
| Wall / Roof Panel | 100mm PUF + 50mm mineral wool composite; U-value ≤ 0.3 W/m²K |
| Blast Rating | 0.5–3.0 psi reflected peak pressure (ASCE 7 / ISO 17776) |
| HVAC | Precision AC, N+1 redundancy, +ve pressure, HEPA option |
| Raised Flooring | 300–600mm void; anti-static grade ≤ 1×10⁹ Ω (IEC 61340) |
| Cable Entry | MCT frames, fire-stopped, EMI-shielded; ATEX glands where required |
| IP Rating | IP54 standard; IP65 available on request |
| Electrical Standards | IS 50244, IEC 61439, IEC 61340, IE Rules |
| EMC Shielding | Galvanised steel skin continuity earthed; shielded cable provisions |
| Doors / Windows | Blast-rated steel door sets; laminated / blast-rated glazing panels |
| Finish | Interior: epoxy anti-static paint; Exterior: marine epoxy + PU coat |
| Delivery Lead Time | 21–45 days from design sign-off |
— The Process
From Enquiry
to Handover
A milestone-based process with no surprises. One point of contact from day one to handover.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Ready to start?
Free consultation. Quote within 24 hours. Project kickoff within a week.
What Our Clients Say
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Trusted by Industry Leaders


















Frequently Asked Questions
View All FAQsStart Your Project
Ready to Start Your Project?
Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.
Explore More
Related Products
Prefab Site Offices
Fully furnished prefab offices for construction sites, factories and remote project locations.
Industrial Enclosures
Custom-built enclosures for heavy industrial and hazardous environment applications.
Railway Shelters
Durable prefab shelters for railway platforms, maintenance yards and track-side installations.
