
Pre-Engineered Warehouses Built for Scale — Faster & Stronger
Column-free spans up to 90m · Delivered 50% faster than RCC · IS 800 & IS 875 compliant · Factory-direct from Wagholi, Pune

What is it?
PEB Warehouses
Pre-engineered warehouses from Poojary Prefab deliver Grade-A logistics specifications at a fraction of the time RCC construction demands. Our Wagholi fabrication plant designs and produces every structural component — portal frames, purlins, cladding — so that on-site work is pure erection, not fabrication. The result: a fully operational warehouse in 60–90 days, months ahead of any RCC alternative.
Conventional RCC godowns impose column grids that interrupt racking rows, restrict vehicle movement, and limit future layout changes. Our PEB warehouses span up to 90m without a single internal column — giving you complete freedom over floor layout, pallet racking configuration, dock placement, and future mezzanine additions.
Poojary Prefab is headquartered in Wagholi, Pune — with direct access to MIDC zones across Chakan, Ranjangaon, Pirangut, Bhosari, and Talegaon. Every warehouse we design is built to IS 800:2007, IS 875, and IS 1893 standards, and is expansion-ready by design so new bays can bolt on as your business grows.
Configurations
Which Type Do You Need?
Every site has different requirements. Here's how our range breaks down.
Distribution Warehouse
40–90m clear span, dock-height loading bays, truck court provision. Built for 3PL, e-commerce fulfilment, FMCG distribution, and high-throughput logistics in Pune and Maharashtra.
Bulk Storage Godown
Simple, cost-efficient clear-span structure for commodity storage — grains, fertiliser, raw materials, spare parts. Lower specification, faster build, lower cost per sq ft.
Mezzanine Warehouse
Structural mezzanine floor integrated in the design — doubles usable storage on the same footprint. Ideal for e-commerce SKU storage or spare parts management.
Insulated Ambient Warehouse
Insulated PUF-panel warehouse for temperature-sensitive goods, cold-chain staging, or FMCG requiring controlled ambient storage in Maharashtra's summer climate.
Key Benefits
Stronger by Design. Smarter by Choice.
Up to 30% Cost Saving
Factory-direct from our Wagholi plant eliminates middlemen markups. PEB warehouses consistently come in 15–30% cheaper than equivalent RCC — plus months of savings from faster delivery.
50% Faster Construction
Compared to conventional RCC — your warehouse is operational months sooner. For e-commerce and logistics clients, that's real revenue from day one, not quarter three.
Dock-Ready by Design
Dock height, levellers, and truck-court clearance are designed in from day one — not retrofitted. Your inbound and outbound operations work from the first day of handover.
IS Code Compliant — Audit Ready
All designs certified to IS 800, IS 875, and IS 1893. Full documentation package ready for MIDC approvals, municipal plan sanction, insurance underwriting, and government tenders.
Applications
Built for Every Industry
Logistics & 3PL
Spacious. Strong. Built for storage.
E-Commerce Fulfilment
Designed for productivity. Built to perform.
FMCG Distribution
Modern spaces. Engineered to inspire.
Agriculture & Cold Chain
Reliable structures for rural progress.
Pharma & Medical
Hygienic. Compliant. Engineered for health.
Automobile Ancillary
Reliable structures for rural progress.
Technical Specifications
Engineered to Excel

| Parameter | Specification |
|---|---|
| Clear Span Width | Up to 90m — column-free floor space |
| Eave Height | 5m to 20m (configured to racking height) |
| Bay Spacing | 6m to 9m standard; custom available |
| Primary Steel Grade | IS 2062 E250 / E350 |
| Roofing | PPGI sheets / PUF insulated sandwich panels |
| Wall Cladding | PPGI / EPS insulated sandwich panels (50–60mm) |
| Design Standards | IS 800:2007, IS 875 Parts I–III, IS 1893 |
| Seismic Compliance | Zones II, III, IV |
| Dock Provision | Dock levellers and dock-height design built-in |
| Optional Add-ons | Mezzanine, EOT crane rails, dock levellers, ridge ventilators |
| Delivery Lead Time | 60–90 days from design sign-off |
| Structural Warranty | 10 years |
— The Process
From Enquiry
to Handover
A milestone-based process with no surprises. One point of contact from day one to handover.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Enquiry & Brief
Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.
Design & Quotation
Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.
Contract & Approvals
We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.
Factory Fabrication
Steel sections are cut, drilled, and assembled in our ISO-certified facility.
Site Erection
Our own erection crew arrives on site. No subcontracting the critical path.
Handover & Support
Structural warranty documentation, post-handover support reachable by phone and WhatsApp.
Ready to start?
Free consultation. Quote within 24 hours. Project kickoff within a week.
What Our Clients Say
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.
We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.
The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
We contracted Poojary for a 60,000 sqft pharma warehouse. IS code compliant, clean-room ready, and handed over in 14 weeks. No surprises, no cost overruns.
Their in-house fabrication and erection team is what sets them apart. Single point accountability — when an issue came up, one call resolved it the same day.
We needed a multi-storey office complex built fast for our IT park. Poojary's container structure solution was cost-effective and delivered in record time.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Three fulfilment centres across Maharashtra — all by Poojary. Consistent quality, reliable timelines, and a team that understands logistics requirements deeply.
Our PEB factory has been operational for three years with zero structural issues. The 10-year warranty gave us confidence, and they've backed it with great after-sales support.
Poojary helped us scale rapidly. We added 30,000 sqft of prefab warehouse space in two months without disrupting our existing operations. Seamless execution.
Trusted by Industry Leaders


















Frequently Asked Questions
View All FAQsStart Your Project
Ready to Start Your Project?
Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.
Explore More
Related Products
Industrial Sheds
Wide-span sheds for manufacturing, assembly and processing. Delivered ready to operate.
Factory Buildings
Custom-engineered factory structures with crane provisions, mezzanine floors and flexible bay layouts.
Cold Storages
Insulated PEB cold storage structures for food, pharma and agri applications.
