LGSF multi-storey building under construction by Poojary Prefab
Light Gauge Steel Framing

Multi-Storey Buildings Built40–60% Faster Than RCC.

LGSF-framed residential, commercial and institutional structures from G+1 to G+7 — IS 801 compliant, seismic zone IV rated, and delivered in a fraction of conventional construction time.

Completed multi-storey prefab building by Poojary Prefab

What is it?

Multi Storey Buildings

Light Gauge Steel Framing (LGSF) is rapidly replacing conventional RCC construction for mid-rise residential, commercial, and institutional projects across India. The technology uses cold-formed, high-tensile steel sections — precisely roll-formed in a factory and assembled on site — to create a complete structural frame that is stronger, lighter, and dramatically faster to erect than brick-and-mortar or cast-in-place concrete alternatives.

Poojary Prefab engineers and manufactures LGSF structures for buildings from G+1 to G+7, covering housing projects, apartment complexes, hotels, office blocks, school campuses, and institutional facilities. Every project begins with a full structural engineering package: load calculations, section sizing, connection design, and compliance verification against IS 801 and NBC provisions. All sections are fabricated at our Pune factory under ISO 9001:2015 quality control, tagged, and delivered to site ready for installation.

Our LGSF buildings are designed to meet seismic zone IV requirements — making them suitable for deployment across all earthquake-prone regions of India including Maharashtra, Gujarat, Uttarakhand, Himachal Pradesh, and the North East. The inherent ductility of the cold-formed steel frame, combined with engineered connections and appropriate sheathing, gives these buildings a performance advantage over unreinforced masonry that is particularly significant in disaster-prone geographies.

Configurations

Which Type Do You Need?

Every site has different requirements. Here's how our range breaks down.

Residential Buildings

G+1 to G+5 housing — villas, row houses, apartment blocks, staff quarters, and government housing projects. Custom floor plans, external cladding options, and architect-coordinated finishes.

Commercial & Office Blocks

Mid-rise office buildings, retail-cum-office blocks, and mixed-use commercial structures. Open-plan floors with long spans, integrated service cores, and fast fit-out timelines.

Institutional Buildings

Schools, colleges, hospitals, and government buildings where early occupancy is critical. Compliant with CPWD, NBC, and state PWD specifications. Accessible design provisions.

Hotels & Hospitality

Mid-scale hotel and resort structures — fast to erect, superior acoustic performance between rooms, and excellent thermal comfort with the right insulation infill and cladding system.

Key Benefits

Stronger by Design. Smarter by Choice.

60% Faster Delivery

Factory-fabricated sections eliminate on-site formwork, casting, and curing cycles. A G+3 structure that takes 18 months in RCC is achievable in 7–9 months with LGSF — a critical advantage for housing developers with committed delivery dates.

Lower Foundation Cost

LGSF structures weigh 30–40% less than equivalent RCC frames. This directly reduces foundation sizes — saving materials, excavation, and time, particularly on poor-soil sites requiring expensive pile or raft foundations.

Sustainable Construction

Steel is 100% recyclable. Dry construction generates less site waste than RCC. The precision of factory fabrication eliminates the material over-ordering and on-site wastage typical of conventional construction.

Seismic & Cyclone Resilience

The ductile, energy-absorbing nature of cold-formed steel framing, combined with engineered connections and structural sheathing, delivers proven performance in seismic zone IV conditions and high-wind cyclone-prone coastal regions.

Applications

Built for Every Industry

Residential Housing application

Residential Housing

Villas, apartments, staff quarters

Commercial Offices application

Commercial Offices

Office blocks, mixed-use buildings

Government Projects application

Government Projects

PWD, CPWD, state housing

Hotels & Resorts application

Hotels & Resorts

Mid-scale hospitality structures

Institutional application

Institutional

Schools, colleges, civic buildings

Disaster Relief application

Disaster Relief

Post-disaster permanent housing

Technical Specifications

Engineered to Excel

ParameterSpecification
Frame SystemCold-formed light gauge steel sections (LGSF)
Steel GradeG550 / G500 high-tensile galvanised steel
Section Thickness0.55 mm to 2.0 mm, as per structural design
Structural CodeIS 801:1975 (cold-formed steel), NBC 2016
Seismic ComplianceDesigned for Seismic Zone II to Zone IV
Building HeightsG+1 to G+7 (subject to engineered design)
Fire Rating1–2 hours (with gypsum board sheathing)
Thermal InsulationMineral wool or EPS infill within wall cavity
Acoustic PerformanceSTC 40–55 dB between party walls (sheathing dependent)
FoundationConventional RCC strip / raft (reduced section vs. RCC frame)
Construction Speed40–60% faster than equivalent RCC structure
Delivery60–90 days, site-specific

— The Process

From Enquiry
to Handover

A milestone-based process with no surprises. One point of contact from day one to handover.

01
Stage 1

Enquiry & Brief

Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.

02
Stage 2

Design & Quotation

Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.

03
Stage 3

Contract & Approvals

We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.

04
Stage 4

Factory Fabrication

Steel sections are cut, drilled, and assembled in our ISO-certified facility.

05
Stage 5

Site Erection

Our own erection crew arrives on site. No subcontracting the critical path.

06
Stage 6

Handover & Support

Structural warranty documentation, post-handover support reachable by phone and WhatsApp.

Ready to start?

Free consultation. Quote within 24 hours. Project kickoff within a week.

Start Your Project Today
Client Feedback

What Our Clients Say

Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.

R
Rajesh Shetty
Plant Head — AutoParts Manufacturing

We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.

S
Sunil Nair
Project Manager — Infrastructure Developers

The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.

P
Priya Menon
MD — FreshChain Logistics

Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.

R
Rajesh Shetty
Plant Head — AutoParts Manufacturing

We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.

S
Sunil Nair
Project Manager — Infrastructure Developers

The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.

P
Priya Menon
MD — FreshChain Logistics

Trusted by Industry Leaders

Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India
Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India

Frequently Asked Questions

View All FAQs

Start Your Project

Ready to Start Your Project?

Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.

Chat on WhatsApp