Poojary Prefab Pvt Ltd
Prefab canteen unit serving workers on a construction campus
Cafeteria & Canteen Units

Prefab Canteen Units.Compliant, Fitted, Ready to Serve.

FSSAI-compliant prefab cafeteria and canteen units for factories, construction campuses and corporate offices. Kitchen equipment provisions, exhaust hood, serving counter, and seating for 20–200 persons. Delivered and operational in days.

Interior of a prefab cafeteria with stainless steel counter and seating

What is it?

Cafeteria & Canteen Units

A canteen is a statutory requirement on every factory or construction site employing more than 250 workers under the Factories Act, 1948, and a practical necessity for any large campus regardless of headcount. Building a permanent canteen structure takes months. A prefab canteen unit is fabricated off-site, delivered complete, and serving meals within days of arrival.

Poojary Prefab canteen units are designed around the FSSAI food safety layout guidelines — separate raw material storage, cooking area, serving counter, and dining zone, with cross-contamination barriers and the required ventilation. The kitchen section comes with an exhaust hood provision, stainless steel counter options, LPG connection points, and electrical loading for commercial kitchen equipment. The dining section fits standard canteen tables and benches for your headcount.

We've supplied canteen units for construction site campuses, manufacturing plant expansions, remote project sites, corporate office fit-outs, and defence facilities. Capacities range from 20-person snack counters for small offices to 200-person full-service canteens for large industrial campuses. Multiple units can be joined to scale the serving and seating area.

Configurations

Which Type Do You Need?

Every site has different requirements. Here's how our range breaks down.

Compact Snack Counter

20–50 person capacity. Hot beverage, snack, and light meal service. Basic kitchen equipment provisions, serving counter, and dining area. Ideal for site offices and mid-size campuses.

Full-Service Site Canteen

50–100 person capacity. Complete kitchen with cooking zone, LPG provision, exhaust hood, stainless steel counters, serving line, and separate dining seating area.

Large Campus Cafeteria

100–200 person capacity. Multiple linked units creating separate kitchen, hot service counter, cold section, and a large dining hall. For factories, construction campuses, and corporate office parks.

Modular Add-On Units

Extend an existing canteen by adding linked kitchen, serving, or seating modules. Each add-on unit connects to the main canteen block with shared utility provisions.

Key Benefits

Stronger by Design. Smarter by Choice.

Statutory Compliance

The Factories Act mandates a canteen for sites employing 250 or more workers. Our units are designed around FSSAI food safety layout requirements so you meet the standard from day one.

Comfortable Dining Environment

PUF-insulated walls and roof with AC provision keep the dining area cool even in peak summer. Exhaust ventilation removes cooking heat and odour from the kitchen zone.

Operational Within Days

Pre-fitted kitchen provisions, serving counters, and seating arrive ready to connect. Connect LPG, power, and water supply — the canteen is serving meals within 48 hours of installation.

Scalable and Relocatable

Add a seating module or kitchen extension as headcount grows. When the project ends, the entire canteen is crane-lifted and moved to your next site — a reusable asset across multiple deployments.

Applications

Built for Every Industry

Construction Campuses application

Construction Campuses

BOCW Act welfare canteen facilities

Manufacturing Plants application

Manufacturing Plants

Factories Act compliant staff canteen

Corporate Offices application

Corporate Offices

Employee cafeteria during fit-out or expansion

Remote Project Sites application

Remote Project Sites

Mining, power, and infrastructure projects

Defence & Government application

Defence & Government

Troop messes and project officer canteens

Eco-Conscious Sites application

Eco-Conscious Sites

Low-footprint temporary catering facilities

Technical Specifications

Engineered to Excel

ParameterSpecification
Capacity Range20 persons (compact) to 200 persons (large campus)
Wall & Roof Insulation50–60 mm PUF sandwich panels
Kitchen FlooringSlip-resistant ceramic or epoxy industrial tiles
Counter MaterialStainless steel SS 304 countertop option
Kitchen VentilationExhaust hood provision; exhaust fan + fresh-air inlet
LPG / PNG ConnectionPre-piped connection points in cooking zone
Electrical LoadingCommercial kitchen load: 15A/32A circuits in kitchen
SeatingCanteen tables and benches included per capacity
ComplianceFSSAI kitchen layout; Factories Act canteen norms
Delivery Time10–21 days from order confirmation

— The Process

From Enquiry
to Handover

A milestone-based process with no surprises. One point of contact from day one to handover.

01
Stage 1

Enquiry & Brief

Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.

02
Stage 2

Design & Quotation

Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.

03
Stage 3

Contract & Approvals

We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.

04
Stage 4

Factory Fabrication

Steel sections are cut, drilled, and assembled in our ISO-certified facility.

05
Stage 5

Site Erection

Our own erection crew arrives on site. No subcontracting the critical path.

06
Stage 6

Handover & Support

Structural warranty documentation, post-handover support reachable by phone and WhatsApp.

Ready to start?

Free consultation. Quote within 24 hours. Project kickoff within a week.

Start Your Project Today
Client Feedback

What Our Clients Say

Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.

R
Rajesh Shetty
Plant Head — AutoParts Manufacturing

We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.

S
Sunil Nair
Project Manager — Infrastructure Developers

The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.

P
Priya Menon
MD — FreshChain Logistics

Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.

R
Rajesh Shetty
Plant Head — AutoParts Manufacturing

We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.

S
Sunil Nair
Project Manager — Infrastructure Developers

The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.

P
Priya Menon
MD — FreshChain Logistics

Trusted by Industry Leaders

Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India
Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India

Frequently Asked Questions

View All FAQs

Start Your Project

Ready to Start Your Project?

Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.

Chat on WhatsApp