Poojary Prefab Pvt Ltd
Prefab porta toilet block on a construction site
Porta Toilets

Porta Toilets.Compliant Sanitation, Anywhere in India.

Factory-built toilet blocks for construction sites, industrial campuses, events and remote locations. Single-unit and multi-unit blocks with male/female sections. CPHEEO-compliant. Septic or holding tank options. Delivered and installed pan-India.

Interior of a prefab sanitation unit with FRP fittings

What is it?

Porta Toilets

Sanitation facilities are a legal requirement on every construction site, industrial campus, and large public event — but they're often the last item to be properly addressed. Makeshift arrangements fail in monsoon, become unhygienic rapidly, and expose project managers to compliance risk under the Factories Act and the Building & Other Construction Workers (BOCW) Act. Factory-built prefab toilet blocks eliminate the improvisation.

Poojary Prefab porta toilets are fabricated in steel or FRP (Fibre Reinforced Plastic), fitted with ceramic or FRP sanitary ware, plumbing connections, exhaust ventilation, and either a septic tank or a holding tank depending on your site's drainage arrangement. They arrive on site ready to connect — water supply in, sewage out, and the block is operational.

We build single-unit toilet cabins for small sites and security posts, and multi-unit blocks with up to 20 individual WC compartments with separate male and female sections for large construction campuses, event venues, and industrial sites. Every unit meets CPHEEO sanitation guidelines and BOCW Act ratios for the headcount being served.

Configurations

Which Type Do You Need?

Every site has different requirements. Here's how our range breaks down.

Single-Unit Toilet Cabin

4×4 ft or 4×6 ft single WC and washbasin unit for small sites, security posts, and locations needing individual sanitation facilities. FRP or MS construction.

Multi-Unit Toilet Block

6 to 20 individual compartments in a single modular block with separate male and female sections. For construction campuses, events, and industrial sites serving 50–500 workers.

Combined Toilet & Urinal Block

Male section with WC compartments and a urinal trough; female section with WC compartments and washbasins. Sized to BOCW Act ratios for the project headcount.

Toilet with Septic System

Self-contained unit with integrated septic tank or holding tank. Designed for remote sites without any drainage infrastructure. Periodic tanker emptying connects via a clean-out.

Key Benefits

Stronger by Design. Smarter by Choice.

Statutory Compliance Built In

Every multi-unit block is designed to CPHEEO sanitation guidelines and BOCW Act headcount ratios. Avoid compliance notices, labour welfare violations, and project stoppages due to inadequate sanitation.

Hygienic and Odour-Free

Exhaust ventilation, ceramic sanitary ware, and easy-to-clean FRP or tiled surfaces maintain hygiene standards that makeshift site toilets cannot. Your workforce uses — and respects — a proper facility.

Ready to Connect on Arrival

Pre-plumbed and pre-wired at the factory. On-site work is connecting the water supply and drainage. The block is operational on the day of delivery — no site plumbing construction required.

Moves with Your Site

Crane-liftable and truck-transportable. When your project relocates, the toilet block goes too. No site demolition, no loss of investment — redeployed across multiple project lifetimes.

Applications

Built for Every Industry

Construction Sites application

Construction Sites

BOCW Act compliant worker sanitation

Industrial Campuses application

Industrial Campuses

Factory and warehouse worker facilities

Events & Exhibitions application

Events & Exhibitions

Temporary sanitation for large gatherings

Remote Locations application

Remote Locations

Mining, power and oil & gas field camps

Labour Camps application

Labour Camps

Dormitory and camp sanitation blocks

Eco-Sensitive Zones application

Eco-Sensitive Zones

Holding tank option — zero ground discharge

Technical Specifications

Engineered to Excel

ParameterSpecification
Single-Unit Size4×4 ft, 4×6 ft
Multi-Unit Sizes6–20 compartments; custom widths available
ConstructionFRP panels or MS steel frame with GI cladding
Sanitary WareCeramic or FRP WC pan, washbasin, urinal
FlooringAnti-skid FRP or ceramic tile; elevated frame
VentilationExhaust fan fitted as standard
Sewage DisposalSeptic tank or holding tank; connect to site drainage
Water SupplyOverhead tank or direct pressure connection
ComplianceCPHEEO guidelines; BOCW Act headcount ratios
Delivery Time7–14 days from order confirmation

— The Process

From Enquiry
to Handover

A milestone-based process with no surprises. One point of contact from day one to handover.

01
Stage 1

Enquiry & Brief

Share your site dimensions, usage requirements, and timeline. We'll ask the right questions.

02
Stage 2

Design & Quotation

Our engineers prepare structural drawings, BOQ, and a detailed fixed-price quote.

03
Stage 3

Contract & Approvals

We sign a milestone-based contract with payment terms tied to delivery stages and prepare all technical documentation for statutory approvals.

04
Stage 4

Factory Fabrication

Steel sections are cut, drilled, and assembled in our ISO-certified facility.

05
Stage 5

Site Erection

Our own erection crew arrives on site. No subcontracting the critical path.

06
Stage 6

Handover & Support

Structural warranty documentation, post-handover support reachable by phone and WhatsApp.

Ready to start?

Free consultation. Quote within 24 hours. Project kickoff within a week.

Start Your Project Today
Client Feedback

What Our Clients Say

Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.

R
Rajesh Shetty
Plant Head — AutoParts Manufacturing

We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.

S
Sunil Nair
Project Manager — Infrastructure Developers

The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.

P
Priya Menon
MD — FreshChain Logistics

Poojary Prefab delivered our 45,000 sqft factory in 11 weeks — two weeks ahead of schedule. The quality of the structural steel and the erection team were both excellent.

R
Rajesh Shetty
Plant Head — AutoParts Manufacturing

We needed a labour camp for 400 workers in under 3 weeks. Poojary made it happen. Hygienic, compliant, and delivered on time. We have since ordered three more camps.

S
Sunil Nair
Project Manager — Infrastructure Developers

The cold storage facility has been running flawlessly at -18°C for two years now. FSSAI audit passed on first attempt. Highly recommend Poojary for any cold chain project.

P
Priya Menon
MD — FreshChain Logistics

Trusted by Industry Leaders

Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India
Adani
L&T
Shapoorji Pallonji
Godrej
Mahindra
Reliance
ONGC
Nestlé
Pfizer
Mercedes-Benz India

Frequently Asked Questions

View All FAQs

Start Your Project

Ready to Start Your Project?

Talk to our team — we'll give you a detailed quote within 24 hours. No obligation, no hard sell. Just straight answers.

Chat on WhatsApp